An integrated MOSHIP based system will be designed into the ship, ideally stored within a hangar on the main deck to minimise maintenance burden and free up the main deck space for other roles.

Selection of a horizontal or vertical transfer system will generally be determined by the vessels secondary roles - a vertical system will maximise free main deck space by locating the decompression chambers on a lower deck, whilst a horizontal system will occupy more of the main deck whilst occupying space on a lower deck.

Further Information

JFD Australia mobilises its people and assets to participate in the Royal Australian Navy's 2020 Black Carillon exercise.
Contact us for more information